Complete strip back to shell and core of an existing set of 3 toilet blocks over floor levels 2, 3 and 4.
Works include:
Fit-out of Male, Female and Disabled toilets in a live and fully occupied building
A bespoke design was created utilising an array of varied finishes each with their own set of challenges from concrete vanity units, bronze metal frames with fretwork
All new sanitaryware and cubicles
All elements were installed and achieved a very high quality considering the volume of required interfacing details in such confined spaces