Floors 6 & 7 of 100 Wood St were refurbished to a 'Category A' standard on behalf of Pontegadea UK Ltd, primed for a prospective new tenant. We were also tasked with modernising the main reception area (in occupation) and install new WCs and showers within the basement space.
Works include:
Strip out of all previous tenant’s installations including furniture and Comm’s equipment
A full refurbishment of existing ceilings, including bespoke replacement tiles
Replacement of Fan Coil units to levels 6 & 7 throughout
Refurbishment of existing raised access flooring, including replacement tiles where necessary
Removal of tenant’s installed plant at roof level
New shower room areas and WCs to the basement level for all tenants
Refurbishment works to reception area including new back-lit glazed wall finishes, new glazed entrance canopy
All works were undertaken in a live, occupied building
Reception refurbishment was undertaken in a phased manner to ensure tenants were not affected by the works