Works include:
Residual strip-out/demolition works to the soft strip of previous tenant installations
New ‘Centaur’ roofing to terrace areas
New external bi-folding doors and full height aluminium powder coated window frames and sills with double glazed units
External scaffold and hoist to service the floor with deliveries and waste away
New raised access flooring throughout
New walls, partitions, ceilings, skirtings, doors and ironmongery
New window blinds throughout
Decorations/specialist finishes throughout
New four-pipe heating and cooling fan coil (Ability) units system throughout inclusive of all new secondary ductwork
All-new LED lighting and associated lighting controls system installed throughout
To the external terrace, we supplied and installed a new composite decking system and subframe