Works include:
Strip out of the 79 rooms, including furniture, tea points, and shower rooms
Conversion of double rooms into two single rooms, creating a common lobby
New timber flooring
M&E modifications
New doors and Frames (relocation of some existing doors and frames)
Install (free issue) fixtures and fittings
Extensive upgrade of fire alarm systems, fire-stopping and acoustic works
Decoration throughout