To refurbish the 2nd-floor office space including strip out and replace the basement shower areas with new systems, and finishes.
Works include:
Demolition of old offices, complete strip out of tenant installed systems and finishes
Strip out of electrical and lighting system
New carpet throughout
New SAS ceiling system throughout
New led lighting throughout
Painting and decorating
Strip out shower block and complete refurbishment included;
New tiling
New shower trays and screens
New lighting and Install new walls and door in the bathroom