Works Include:
Re-stack of the existing floor plate whilst fully occupied, the works were carried out in five phases and consisted of:
Reconfiguration of three tea points, including new floor finishes
Re-modelling of WCs in each phase – including new joinery and finishes
Replacement of carpets throughout, whilst furniture in place using a “lift and fit” methodology
Decorations throughout
Replace various electrical fittings including lighting
Various general upgrade items of works