The works to Summit House were fairly extensive in terms of refurbishment and fit-out to this Grade 2 listed building. The scheme involved upgrading the external aesthetic and internal finishes to reflect a more modern, revitalised building.
All new mechanical and electrical installations, new AHU (2nr), boilers and chiller
Repairs to existing faience cladding and masonry elevations
Remedial works to Cathodic Protection System
Structural reconfiguration to maximise NIA within office areas
Refurbishment of Crittall style windows
New secondary glazing throughout
New roof coverings
All new WC areas and finishes
New lift installations (2nr)
New showers to the basement area
New raised floors and suspended ceilings throughout
Feature finishes to the new reception area