New double-storey shopfront
Full façade repairs
New windows
A new terraced area at roof level
Ground Floor and Basement spaces were changed for retail use with all floors above remaining as commercial
Separate entrances were created for each space
New lifts installed to serve each floor
All new MEPH services were installed to include a new VRF system on each floor
New lighting and lighting control
All new toilet ventilation system, electric radiators to stair cores and an all-new Trend BMS system
Architectural works included the infill of an atrium space to gain nett lettable area for future commercial tenants
Full strip out of previous tenant’s offices
All new raised access flooring
Exposed services although lined soffits
New WC refurbishment
Extensive builder’s work within the basement area
Extensive roof works, roof lights, structural glazing, etc.