Strip out to shell and core
Full scaffolding to accommodate façade clean and window repairs/replacement
Full façade clean
Replacing and introducing new Dorma windows
Overhauling of extensive lead work
Replacement/Overlaying of existing roofs
Heavy structural alterations
Installation of 2 new lifts
Installation of new M&E installation including all capital plant
Relocation and fitting out of new toilet cores
Structural changes to the vaulted areas and courtyards
Reconfiguration of stair cores to maximise new floor plate requirements including the installation of two new staircases
Fit-out of basement areas including, managers office, shower rooms, bike racks and storage areas
Fit-out of reception area including new desk and feature joinery and wall finishes
New doors and frames throughout including feature panelled entrance doors
Decorations throughout, internal and external