Structural alterations within the floors to maximise the nett lettable areas
Comprehensive external façade restoration to the full perimeter of the building
New lift core installation and new lifts
Feature ‘Spiegelhalter’ entrance at Ground Floor – ex Jewellery store façade to be retained
Creation of expansive open ‘white box’ in the basement area to facilitate a Gym installation
New / refurbished timber flooring throughout
Drylining to all perimeter walls and sections of ceilings
All new doors and ironmongery throughout
Extensive roof refurbishment including sections of new with associated warranties
Large, new curtain walling section to the reception entrance including new sliding doors and staggered balconies
All new mechanical (Hybrid Mitsubishi) and electrical installations throughout
UKPN works including creation of a new sub-station within the building boundary