The restaurant was closed to enable the works which caused a significant time restraint on completing the works. The works, overall, were completed within 4 weeks (on the programme), per phase.
Works include:
Works to the barrel-vaulted listed ceiling
Careful removal of the existing carpet and underlay so as not to disturb the surface beneath
Laying of a high-quality broadloom carpet throughout
Full redecoration of all walls, ceilings and the bar area
A majority of existing floor boxes were relocated to suit new layouts
Reconfiguration of the CCTV installation
Fibrous cornice works
Full overhaul and re-finishing of the conservatory area